| Description | Qty | Unit | Rate | Total |
|---|---|---|---|---|
|
Surface Prep & Concrete Grinding
Diamond grind full floor, edge work, crack/joint inspection
|
400 | sq ft | $1.50 | $600 |
|
PE-85 Polyurea Crack & Joint Filler
Fill all cracks, control joints, and surface defects
|
1 | kit | $75 | $75 |
|
CP-8355 Base Coat (Flake Broadcast System)
100% solids base coat, full flake broadcast to rejection
|
400 | sq ft | $2.25 | $900 |
|
Decorative Flake
Client's choice of color blend, full broadcast
|
1 | bulk bag | $150 | $150 |
|
RS-EP-100 Clear Topcoat (2 coats)
High-build clear 100% solids topcoat with aluminum oxide antiskid
|
400 | sq ft | $2.75 | $1,100 |
|
Labor — Application & Finishing
2-man crew, ~14 hrs on-site
|
1 | job | $700 | $575 |
| Epoxy Floor Subtotal | $3,200 | |||
| Description | Qty | Unit | Rate | Total |
|---|---|---|---|---|
|
Cabinet Installation — Labor Only
Client supplies cabinets. Full upper & lower install, leveling, securing, and alignment
|
20 | lin ft | $110 | $2,200 |
|
Hardware & Fasteners
Screws, shims, anchors, misc supplies
|
1 | lot | $75 | $75 |
|
Trim & Touch-Up Caulking
All cabinet seams, wall gaps, and finish lines
|
1 | job | $125 | $125 |
| Cabinet Installation Subtotal | $2,400 | |||
| Description | Qty | Unit | Rate | Total |
|---|---|---|---|---|
|
Wall Prep — Patch, Sand & Prime
Skim patch all holes/imperfections, sand, 1 coat primer
|
1,600 | sq ft | $0.625 | $1,000 |
|
Interior Wall Paint (2 coats)
Client's choice of color, premium latex, cut & roll
|
1,600 | sq ft | $1.75 | $2,800 |
|
Ceiling Paint (1 coat)
Flat white ceiling paint, full coverage
|
400 | sq ft | $1.00 | $400 |
|
Trim & Baseboards (2 coats semi-gloss)
All door casings, window trim, and base molding
|
1 | job | $350 | $350 |
|
Paint Materials
Primer, paint (approx. 6 gallons), tape, drop cloths, rollers
|
1 | lot | $250 | $250 |
| Painting Subtotal | $4,800 | |||
| Description | Qty | Unit | Rate | Total |
|---|---|---|---|---|
|
Vanity Installation — Labor Only
Client supplies vanity unit. Remove existing, set and level new vanity, reconnect plumbing supply lines
|
1 | job | $400 | $400 |
|
Plumbing Supply Line Connection
Hot/cold supply, P-trap, drain connection. Does not include rough plumbing modifications.
|
1 | job | $125 | $125 |
|
Caulk & Finish
Seal all perimeter joints, touch-up around vanity
|
1 | job | $75 | $75 |
| Vanity Subtotal | $600 | |||